Skip to content
Anthworks

Bricks & Building Materials

Production you can count. Breakage you cannot. Yard stock nobody agrees on.

Production you can count, breakage you cannot, and yard stock nobody agrees on. Clay kiln, fly ash press or AAC line, the pattern is the same: material goes in, a batch cures for days, and breakage happens at every handling.

Operational areas

  • Batches
  • Raw material
  • Breakage
  • Yard stock
  • Dispatch

Built for this

Bricks Management System

Batches, consumption, breakage, yard stock and dispatch

One afternoon

Ten thousand bricks go into the kiln. Somewhere between firing, unloading, sorting and loading onto a tractor, a number of them break. Nobody counts. The supervisor says roughly eight per cent. The yard says something else. Both are guesses, and the margin lives in the gap between them.

Bricks & Building Materials businesses manage a constant flow of

  • Raw material
  • Batches
  • Kiln cycles
  • Drying yards
  • Breakage
  • Grades
  • Yard stock
  • Orders
  • Loading
  • Transport

The operation

How the business runs — and where it stops being visible

Every stage produces information. The problem is rarely any single stage; it is that they never meet. The marked stages are where the record either stops, or stops being trusted.

  1. Raw material

  2. Moulding / pressing

  3. Drying

  4. Firing or curing

    Breakage happens inside the cycle and gets discovered days later at sorting

  5. Sorting & grading

    The grade mix a batch actually produced is estimated, not counted

  6. Yard stacking

    Yard stock is a number three people disagree about

  7. Loading

  8. Dispatch

Where it breaks

The problems that cost real money

Not the ones a brochure lists. The ones that come up when you sit with the person doing the work.

Coal or cement per unit is estimated once a year

Coal per lakh bricks for a kiln, cement and fly ash per thousand blocks for a press. This is the number that decides whether you are making money, and it is usually a memory from last season.

Breakage disappears into the word 'normal'

Loss at unloading, at sorting, at stacking, at loading. Real, cumulative, and almost never recorded as a percentage anyone can track over time.

Yard stock is a guess that everyone treats as a fact

Multiple sizes and grades stacked across a yard, counted by eye. The register and the yard diverge steadily, and the difference is booked as breakage regardless of where it actually went.

Under-cured stock goes out when demand is high

Fly ash and concrete blocks need their curing days. Under pressure they leave early, come back as a complaint, and nobody can trace which batch it was.

Ex-yard or delivered, with or without unloading

Sold verbally, billed inconsistently. Realisation per thousand is never clean, and two customers paying the same rate are earning you different margins.

What changes

What the system changes

Production recorded by batch, breakage by stage, stock by size and grade. Consumption per unit and rejection percentage become daily figures instead of annual guesses, and dispatch works off stock that actually exists.

The product

Built for this industry: Bricks Management System

Bricks Management System runs production batches, raw material consumption, breakage, yard stock and dispatch, for clay kilns, fly ash brick units, and concrete and AAC block plants.

Production batches

Batch or kiln-cycle records, quantity produced, machine and shift-wise output, batch traceability

Raw materials

Soil, fly ash, cement, sand, gypsum, coal and aggregate. Receipt, issue, consumption per unit produced

Curing & firing

Curing days, kiln firing cycle, readiness status, hold on under-cured stock before dispatch

Quality & breakage

Grading into first, second and reject class, breakage by stage, rejection percentage by batch

Yard stock

Stock by product, size and grade, physical count reconciliation, yard location, ageing stock

Orders & sales

Customer orders, rate by product and quantity slab, ex-yard vs delivered pricing, advance and credit

Custom & enterprise

When the product isn't the whole answer

Multiple kilns or lines, a captive transport fleet, or a plant that supplies its own projects as well as the market. Where the operation is larger than the product assumes, we extend it around what you actually run.

Our approach

However it gets built, it starts the same way

We spend time in the operation before proposing anything. The first three stages finish before a single screen is designed.

  1. Understand

    How the business actually works

  2. Analyse

    Where time, money and clarity are lost

  3. Research

    What the better way forward looks like

  4. Design

    Workflows, data and interfaces

  5. Build

    Modern, maintainable technology

  6. Evolve

    Improve as the business changes

Let's understand your operation.

Tell us how the business runs today and where it becomes difficult. We'll start there.